CONTROL ACCESS · Products, brands and documentation
Control Access memo · 26 October 2026

CE self-declaration: the process for a powered gate

Process memo · responsibilities, tests and documents

Who declares conformity?

Here, “self-certification” means assessment through internal control: the manufacturer demonstrates conformity and declares it under its own responsibility. It is not a certificate issued by a third party. An ordinary gate outside categories requiring special procedures does not automatically require a notified body; check the classification and other applicable legislation.

The six-step process

  1. Identify the responsible manufacturer

    A complete gate, possibly supplied as a kit, retains its designated manufacturer when installed under the intended conditions. Combining components from different sources or powering a manual gate may make the integrator the manufacturer of the new assembly.

  2. Assess and reduce risks

    Assess use, exposed people, hazardous areas and controls; define protective measures and their integration. CE marking on individual components does not establish conformity of the complete powered gate.

  3. Verify the installation and record tests

    Test safety functions, stopping or reversal and emergency release. Where force limitation is used, measure forces using suitable equipment and the applicable method, and retain the results.

  4. Compile the technical file

    Collect identification, drawings, schematics, risk assessment, protective solutions, component instructions and declarations, test reports and documents for the complete gate.

  5. Declare and mark the machinery

    Once conformity has been demonstrated, prepare the complete EC declaration, dated and signed by the authorised person, then affix the identification and CE marking to the gate.

  6. Hand over and retain documents

    Give the customer the declaration, French instructions, emergency-release guidance and maintenance information. Under the Directive, retain the file and declaration for at least ten years after manufacture, or manufacture of the last unit in a series.

Distinguish the two legal regimes

Transition: from 20 January 2027, Regulation (EU) 2023/1230 provides for internal control under Module A, Annex VI; technical documentation is covered by Annex IV A and the EU declaration by Annex V A. Its minimum retention period is ten years after placing on the market or putting into service.

Directive 2006/42/EC

Internal control: Annex VIII. Technical file: Annex VII A. EC declaration: Annex II, Part 1 A.

Regulation (EU) 2023/1230

Module A: Annex VI. Technical documentation: Annex IV A. EU declaration: Annex V A.

Your memo to keep

This memo describes a process. Each installation requires its own conformity evidence; Construction Products requirements and other applicable legislation must be checked separately.

Manufacturer documents remain in their original language.

Your quotation request

Would you prefer a phone call? Request a callback

Local selection, with no automatic submission. Product groupings and variants will need to be clarified with Control Access.

Your project and contact details

Your contact details stay on this page. Do not enter any access code, password or identity document. You can attach plans and photos from your email application.

Local PDF catalogue

Local documentOpen in a tab ↗

Catalogue image

Image extracted from the supplied PDF. Sharpness remains limited by the source image resolution. No additional view has been invented.